Services
- New construction planning
- New greenfield construction
- Relocation of existing production areas
- Production site analysis
- Redesigning and expansion planning
- Remodeling of existing production sites
- Expanding production capacity
- Redesigning based on new products and technologies
- Factory optimization
- Increasing efficiency with moderate resource means
- Process analysis and optimization
- Materials flow analysis and optimization
- Layout analysis and optimization
- Permanent factory planning
- Factory planning as part of a long-term company strategy
- Development of a long-term usage plan
- Fire protection planning
- Building survey
- Fire protection concepts
- Fire protection plans/firefighting plans
Key Areas
- Recording/analysis of actual state
- Numerical data
- Current assets
- Buildings & areas
- Conceptual planning
- Factory structural planning
- Planning of production processes
- Area planning
- Layout planning (block layout, rough layout)
- Detailed planning
- Layout planning (fine layout)
- Listing of the technical specifications
- Workplace design
- Ergonomics
- Implementation planning
- Invitation to tender
- Supplier evaluations
- Project completion
- Revision of planning documents (target/actual)
- Completion documentation
Project Examples
- Materials flow optimization in the business unit for precision swivels in an engineering company
- New planning for greenfield satellite production
- Rough and fine layout planning in machine and automotive assembly
- Facility planning for a textile company
Media
Steinbeis Transfer Magazine
http://www.stw.de/su/1619
Legals for this enterprise profile:
Steinbeis-Transferzentrum Fabrikplanung GmbH | Marlene-Dietrich-Straße 1, 89231 Neu-Ulm
Phone: +49 731 9806280 | Fax: +49 731 9806282 | AG Memmingen, HRB 15125 | An enterprise in the Steinbeis Network
Managing Director: Dipl.-Ing. (FH) Roland Frank | www.stz-fabrikplanung.de | info@stz-fabrikplanung.de